Blessed Assurance Education Trust · Nairobi
The school already says yes to every child. The building is the last thing saying no.
The academy admits every child who applies, regardless of disability. Sixteen vertical levels across four blocks still need the work that makes that true in practice: railings, lifts, tactile paths, an adapted bus.
01 · The trust
What we are working with
The Trust holds the land, the buildings and the bus on behalf of the school it operates. The school already admits every child who applies. The estate is what has not caught up.
- 320learners today
- 16vertical levels
- 4multi-storey blocks
- 2campuses
The Trust
- Incorporated
- 11 March 2026
- Registration
- TPS-VMC47G, Trustees (Perpetual Succession) Act, Chapter 164
- Trustees
- James Muithya Kilonzo and Carolyne Mwongeli Muithya
- Founding capital
- KES 50,000
- Role
- Holds land, buildings and vehicles for the charitable educational objects. No asset may be distributed to trustees, in operation or on winding up.
The Academy
- Operates under
- Education Act, Chapter 210
- Learners
- 320, day and boarding junior secondary
- Campuses
- Syokimau, behind Gateway Mall on Airport Road, and Prideland on Merryland Road, Katani
- Admissions
- Zero-discrimination policy, aligned with Kenya’s 100% secondary transition policy
- Building for
- Children with disabilities and with sensory or learning differences, including deafness, visual impairment and autism
02 · The plan
Four things the plan does
Tracking what each learner gains
Measure net growth rather than a single score: an entry baseline against an exit score eight years later, with the pattern used to spot the cohorts that need support.
Inclusive, PWD-adaptive infrastructure
Remodel the campus for physical accessibility, buy assistive devices, and train teachers in inclusive education methodology.
Specialised campus transport
An adapted transport system with trained care assistants on the commute, for learners with mobility and sensory challenges.
Sustainable resource mobilisation
Turn KES 50,000 of founding capital into a funded institutional asset, through institutional donors, diplomatic missions and corporate foundations.

03 · The estate
Four blocks. Sixteen levels.
- Block A
- Block B
- Block C
- Block D
Every one of the sixteen needs work before a child with a wheelchair, a white cane or a hearing aid can use the building on the same terms as everybody else.
A and B: classrooms and learning labs. C and D: administration, specialised science labs, libraries and multi-purpose spaces.
04 · The ask
Year one is the one that moves
KES18,000,000
That is the first slice of a five-year plan priced at 38,050,000. Year one is the part that can be funded now, and the part that changes what a child can physically reach.
Year one · 18,000,000Phases 2–3 · 20,050,000
The lifts and the escalator are phases two and three, scheduled against larger international tranches. That is why the plan is modular: the cheapest, highest-impact work happens first.
What year one buys
- Adaptive PWD school bus8,500,000One 33-seater midi-bus with a hydraulic tail-lift
- Safety railings, all 16 levels4,000,000Stainless, dual height, corridors and staircases
- Civil and structural works3,500,000Shaft openings and structural preparation
- Specialised disability kits2,000,000Braille materials, auditory kits, tactile paving

05 · The budget
Where the money goes
Eight priced lines from the Trust’s 2026–2031 plan, at Nairobi rates. Unit rates are the plan’s own, so a funder can check the arithmetic rather than take our word for it.
| Line item | Unit rate | Total | Phase |
|---|---|---|---|
| Adaptive PWD school busOne 33-seater midi-bus, hydraulic tail-lift, floor tracks and anchor straps | 8,500,000 | 8,500,000 | Phase 1 |
| Continuous safety railingsStainless dual-height guardrails, corridors and staircases, all 16 levels | 250,000 per floor | 4,000,000 | Phase 1 |
| Civil and structural worksReinforced masonry adjustments, shaft openings, structural preparation | lump sum | 3,500,000 | Phase 1 |
| Specialised disability kitsBraille materials, auditory learning kits, tactile paving for visual navigation | lump sum | 2,000,000 | Phase 1 |
| Commercial passenger liftsTwo 5-stop traction lifts, Blocks C and D | 4,500,000 each | 9,000,000 | Phase 2 |
| Commercial escalator lineOne unit, ground to first floor, Block C | 6,500,000 | 6,500,000 | Phase 3 |
| Professional feesArchitectural and structural engineering oversight, about 6% | fixed scale | 1,500,000 | Ongoing |
| Standard fleet operationsInsurance, driver and assistant training, initial fuel, years 1 to 5 | annual | 3,050,000 | Annual |
Total 38,050,000, of which 18,000,000 falls in the first year. The rest is scheduled against phases two and three.
06 · The controls
Who watches the money
These are the Trust’s own rules, written into the Deed and the plan. They are the reason a gift here can be accounted for later.
Accounts in the Trust's name
Every bank account is held strictly in the name of the Trust. No donation passes through an intermediary.
Two signatures to move money
Cheques and cash withdrawals require the physical signatures of no fewer than two trustees.
The common seal needs two trustees
It may only be affixed with their authority and in their presence, and both sign the instrument.
Two trustees form a quorum
That is the minimum for a valid meeting and for any financial decision.
An annual statutory return
Trustee names, addresses and occupations are filed with the Registrar of Companies every year, one month after the anniversary of incorporation.
A ring-fenced capital account
Stage three of the plan opens a CapEx account requiring dual trustee signatures and an independent project auditor's sign-off.
07 · Give
Give to year one
Donations go into the Trust’s own account. M-Pesa is the cheapest route for a Kenyan donor, and a card works from abroad. Both are being connected while the paybill application is processed.
Every payment route is the Trust’s own, and Worp Studios never holds donated funds. A card gift from abroad is proof of payment, not a tax receipt: a receipt a donor can claim at home can only come from a charity registered there.
Fund a line item
- Adaptive PWD school bus8,500,000Ask about this line
- Safety railings, one floor250,000Ask about this line
- Civil and structural works3,500,000Ask about this line
- Specialised disability kits2,000,000Ask about this line