A learner spinning a hula hoop on the school field, with other children around her

Blessed Assurance Education Trust · Nairobi

The school already says yes to every child. The building is the last thing saying no.

The academy admits every child who applies, regardless of disability. Sixteen vertical levels across four blocks still need the work that makes that true in practice: railings, lifts, tactile paths, an adapted bus.

01 · The trust

What we are working with

The Trust holds the land, the buildings and the bus on behalf of the school it operates. The school already admits every child who applies. The estate is what has not caught up.

  • 320learners today
  • 16vertical levels
  • 4multi-storey blocks
  • 2campuses

The Trust

Incorporated
11 March 2026
Registration
TPS-VMC47G, Trustees (Perpetual Succession) Act, Chapter 164
Trustees
James Muithya Kilonzo and Carolyne Mwongeli Muithya
Founding capital
KES 50,000
Role
Holds land, buildings and vehicles for the charitable educational objects. No asset may be distributed to trustees, in operation or on winding up.

The Academy

Operates under
Education Act, Chapter 210
Learners
320, day and boarding junior secondary
Campuses
Syokimau, behind Gateway Mall on Airport Road, and Prideland on Merryland Road, Katani
Admissions
Zero-discrimination policy, aligned with Kenya’s 100% secondary transition policy
Building for
Children with disabilities and with sensory or learning differences, including deafness, visual impairment and autism

02 · The plan

Four things the plan does

  1. Tracking what each learner gains

    Measure net growth rather than a single score: an entry baseline against an exit score eight years later, with the pattern used to spot the cohorts that need support.

  2. Inclusive, PWD-adaptive infrastructure

    Remodel the campus for physical accessibility, buy assistive devices, and train teachers in inclusive education methodology.

  3. Specialised campus transport

    An adapted transport system with trained care assistants on the commute, for learners with mobility and sensory challenges.

  4. Sustainable resource mobilisation

    Turn KES 50,000 of founding capital into a funded institutional asset, through institutional donors, diplomatic missions and corporate foundations.

A basketball dropping through a hoop against an overcast Nairobi sky
Basketball court at the academy.

03 · The estate

Four blocks. Sixteen levels.

  • Block A3 levels
  • Block B3 levels
  • Block C5 levels
  • Block D5 levels

Every one of the sixteen needs work before a child with a wheelchair, a white cane or a hearing aid can use the building on the same terms as everybody else.

A and B: classrooms and learning labs. C and D: administration, specialised science labs, libraries and multi-purpose spaces.

04 · The ask

Year one is the one that moves

KES18,000,000

That is the first slice of a five-year plan priced at 38,050,000. Year one is the part that can be funded now, and the part that changes what a child can physically reach.

Year one · 18,000,000Phases 2–3 · 20,050,000

The lifts and the escalator are phases two and three, scheduled against larger international tranches. That is why the plan is modular: the cheapest, highest-impact work happens first.

What year one buys

  • Adaptive PWD school bus8,500,000One 33-seater midi-bus with a hydraulic tail-lift
  • Safety railings, all 16 levels4,000,000Stainless, dual height, corridors and staircases
  • Civil and structural works3,500,000Shaft openings and structural preparation
  • Specialised disability kits2,000,000Braille materials, auditory kits, tactile paving
A football match on the school field with two school buses parked behind
A match on the school field, with one of the school's buses behind.

05 · The budget

Where the money goes

Eight priced lines from the Trust’s 2026–2031 plan, at Nairobi rates. Unit rates are the plan’s own, so a funder can check the arithmetic rather than take our word for it.

Capital expenditure, 2026 estimate
Line itemUnit rateTotalPhase
Adaptive PWD school busOne 33-seater midi-bus, hydraulic tail-lift, floor tracks and anchor straps8,500,0008,500,000Phase 1
Continuous safety railingsStainless dual-height guardrails, corridors and staircases, all 16 levels250,000 per floor4,000,000Phase 1
Civil and structural worksReinforced masonry adjustments, shaft openings, structural preparationlump sum3,500,000Phase 1
Specialised disability kitsBraille materials, auditory learning kits, tactile paving for visual navigationlump sum2,000,000Phase 1
Commercial passenger liftsTwo 5-stop traction lifts, Blocks C and D4,500,000 each9,000,000Phase 2
Commercial escalator lineOne unit, ground to first floor, Block C6,500,0006,500,000Phase 3
Professional feesArchitectural and structural engineering oversight, about 6%fixed scale1,500,000Ongoing
Standard fleet operationsInsurance, driver and assistant training, initial fuel, years 1 to 5annual3,050,000Annual

Total 38,050,000, of which 18,000,000 falls in the first year. The rest is scheduled against phases two and three.

06 · The controls

Who watches the money

These are the Trust’s own rules, written into the Deed and the plan. They are the reason a gift here can be accounted for later.

  • Accounts in the Trust's name

    Every bank account is held strictly in the name of the Trust. No donation passes through an intermediary.

  • Two signatures to move money

    Cheques and cash withdrawals require the physical signatures of no fewer than two trustees.

  • The common seal needs two trustees

    It may only be affixed with their authority and in their presence, and both sign the instrument.

  • Two trustees form a quorum

    That is the minimum for a valid meeting and for any financial decision.

  • An annual statutory return

    Trustee names, addresses and occupations are filed with the Registrar of Companies every year, one month after the anniversary of incorporation.

  • A ring-fenced capital account

    Stage three of the plan opens a CapEx account requiring dual trustee signatures and an independent project auditor's sign-off.

07 · Give

Give to year one

Donations go into the Trust’s own account. M-Pesa is the cheapest route for a Kenyan donor, and a card works from abroad. Both are being connected while the paybill application is processed.

Every payment route is the Trust’s own, and Worp Studios never holds donated funds. A card gift from abroad is proof of payment, not a tax receipt: a receipt a donor can claim at home can only come from a charity registered there.

Fund a line item